What affects the duration?
Concealed fittings, strongly bonded tiles and several floor layers can add work. A narrow upstairs route is different from direct ground-floor access. Explain whether the home remains occupied.
Prepare before the workday
The relevant installer makes connections safe. Clear personal belongings and arrange building access, protection and any association requirements. Missing permissions or documents can affect the proposed start.
Request a useful programme
Share overview photos, dimensions, floor build-up and the external route. Agree what is delivered at handover and which repairs belong to the following contractor. The programme follows that defined scope.
Preparation at a glance
- Photograph fittings, walls and floor.
- Include staircase and lift details.
- Confirm isolation and the required end condition.
Frequently asked question
Can you promise the same completion day for every bathroom?
No. A fixed programme needs sufficient information about scope, preparation and transport.