One scope for all parties
Use a shared component list or drawing. The owner, demolition contractor and following trades should work towards the same end condition.
Conditions before starting
Arrange service isolation, access, documents and permissions. Identify suspicious material and unknown structural functions before execution.
Handover and changes
Agree how concealed defects or extra work are assessed and authorised. Record remaining issues so the next contractor knows what repairs or building work follow.
Preparation at a glance
- Share old and new drawings.
- Confirm access and service release.
- Identify who may approve changes.
Frequently asked question
Which photos help preparation?
Room overviews, component details and the complete access and waste route. Include drawings and dimensions when available.