What stays?
A full interior strip-out can still be renovation demolition because the building remains. Define the components and structural boundaries rather than relying on the word complete.
Equipment and logistics
Interior removal may depend on stairs, rooms and retained finishes. Whole-structure demolition needs a site plan, structural assessment and suitable equipment access.
Procedures and costs
Notification, permits, services, materials and waste depend on the actual activity. Quotes must match the same scope and end condition.
Preparation at a glance
- Define the retained building.
- Specify foundations separately.
- Use the actual scope for procedures and quotations.
Frequently asked question
Is stripping every room complete demolition?
No. If the building remains, agreed interior removal is strip-out or renovation demolition.