Building boundaries
Specify the house, extensions, roof and foundation parts included. Identify neighbouring or shared construction and any elements to retain.
Preparation and procedures
Provide drawings and material information. Safe service isolation, relevant investigations and official address-specific checks come before execution.
Clear site and follow-on work
Agree waste removal and the final level of the site. Foundation work, earthworks and preparing the new build require separate definitions.
What is included?
The quotation lists removed components and layers, protection and waste arrangements. Structural provisions, service adjustments and reinstatement are included only where expressly specified.
Prepare your request
- Site and building drawings.
- Demolition boundary including foundations.
- Services, materials and neighbouring buildings.
Costs and programme
A reliable price and duration follow assessment of the scope, materials and access. Include your preferred date. Documents, safe service release and permissions may affect the start.
| Price factor | Assessment |
|---|---|
| Building size and structure | Your property and the agreed removal scope |
| Preparation and access | Your property and the agreed removal scope |
| Foundations and waste transport | Your property and the agreed removal scope |
Demolition costs and price factors
Work sequence and safety
Photos and documents support the initial assessment. Where needed, a site visit or specialist information follows. Equipment, dust control, protection, sorting and handover fit the actual project. Unknown materials or structural functions require assessment before work continues.
Your Amsterdam property
Include the floor level, access route and permitted lift loads. Shared areas, homeowners’ association arrangements and any protected status are considered when preparing the work.
Frequently asked questions
Is house demolition the same as stripping the house?
No. Strip-out retains the building and removes selected interior components.
What is included at handover?
The agreed demolition extent and waste arrangements. Ground preparation and new construction must be specified separately.
