GUIDE

Demolition notification or permit: what is the difference?

A demolition notification supplies the required information before a notifiable demolition. An environmental permit is a separate authorisation for an activity. A project may need both: check the address and work through the official Omgevingsloket.

Read the explanation
GUIDE

Preparing a demolition notification

Collect the removal boundaries, building documents, material information and estimated waste volume. The required attachments depend on the activity; follow the current official Omgevingsloket form.

Read the explanation
GUIDE

DIY or professional bathroom demolition?

Consider the scope, services, substrate and waste route. Removing loose fittings is different from removing tiles, screed or concealed components. Unknown or structural elements need expert assessment.

Read the explanation
GUIDE

How long does bathroom demolition take?

A reliable programme follows assessment of sanitary fittings, tile adhesion, underlying layers and access. Bathroom size alone is insufficient; preparation and waste transport also take time.

Read the explanation
GUIDE

Comparing demolition quotes

Compare quotations against the same removal boundary. A lower total can include fewer layers, protective measures, waste arrangements or repairs. Ask for identifiable work items and clear extra-work terms.

Read the explanation
GUIDE

Kitchen dismantling or demolition?

Dismantling releases components for possible reuse. Demolition removes the kitchen for renovation. Condition, fixings and the intended destination determine which approach is useful.

Read the explanation
GUIDE

Tile removal with underfloor heating

Retaining underfloor heating must be assessed before tile removal. Pipe position, cover and the tile, adhesive and screed layers determine the possibilities.

Read the explanation
GUIDE

Concrete floor or cement screed: why it matters

Cement screed is generally a finishing layer above a supporting floor. A concrete floor may itself be structural. Establish the layers and function before removal.

Read the explanation
GUIDE

The structural engineer’s role in wall removal

The structural engineer assesses the existing load path and designs how loads transfer after an opening is made. Calculations and execution details provide the basis for the work.

Read the explanation
GUIDE

Demolition and the homeowners’ association

In an apartment, distinguish private components from shared building parts. Check the deed of division, association rules and required consent. Communal access also needs practical arrangements.

Read the explanation
GUIDE

Apartment strip-out: define the handover

Apartment strip-out removes agreed interior components. Shared elements, structure and services need separate assessment. Prepare a room-by-room list with the next contractor.

Read the explanation
GUIDE

Demolition waste removal in Amsterdam

Waste removal depends on material, quantity and access. Construction and demolition waste does not belong in ordinary household collection. Plan equipment and collection locations in advance.

Read the explanation
GUIDE

Circular demolition and actual reuse

Circular demolition selects components that can safely be used again. Reuse becomes concrete when condition, dismantling method and destination are known.

Read the explanation
GUIDE

Renovation or complete demolition?

Renovation demolition retains the building and removes selected components. Complete demolition removes an entire structure or a defined building section.

Read the explanation
GUIDE

Preparing for the demolition phase of a renovation

Good preparation records the removal boundaries, retained elements, services, waste route and handover requirements. The proposed new drawings help define the necessary work.

Read the explanation
GUIDE

Preparing demolition in a canal house

For a canal house, assess existing construction, retained details, protected status and access. Appearance alone does not identify the rules or risks for the address.

Read the explanation
GUIDE

Demolition on upper floors: stairs, lifts and waste

On an upper floor, stairs, lifts, doorways and permitted loads determine the transport route. A small room may produce substantial heavy rubble.

Read the explanation
GUIDE

Partial chimney removal

Partial removal first requires assessment of the chimney sections that remain. Upper floors or the external stack may depend on masonry being removed below.

Read the explanation
BACKGROUND

Zuidas: background to demolition and redevelopment

This background article explains work packages in urban redevelopment. It is not a project completed by Amsterdam Sloopbedrijf.

Read the explanation
BACKGROUND

IJmuiden Sea Lock: infrastructure background

This retained article provides background to infrastructure in the Amsterdam port region. It is not a portfolio of Amsterdam Sloopbedrijf’s work.

Read the explanation

YOUR PROJECT STARTS HERE

Tell us what needs to go.
We help define the approach.

A bathroom, house or commercial property? Photos and a short description help the initial assessment. Complex work may need a site visit or further documents.

085 800 2900General enquiries
06 25224332Direct / mobile

Or email info@amsterdamsloopbedrijf.nl.

Request a tailored quote

Fields marked * are required to assess your request.

JPG, PNG, WebP, HEIC or PDF. Maximum 6 files, 5 MB per file and 15 MB in total.

    Call 085 800 2900Request a quote